You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Waduk Kamal Masih Terkendala

Kamal Reservoir Construction Still Awaits Land Acquisition

We will wait until the process is completed first. And then continued with land acquisition and compensation

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

The construction of Kamal Reservoir, Kamal Urban Village, Kalideres, West Jakarta, still hampered by land acquisition. From total of 40 hectares needed, the land that has been acquired is only 5 hectares.

Tegal Alur Urban Village Head, Ahmad Mawardi said that most of the land has not been acquired is used by local residents for fish farming, shrimp and residence. Currently, they have filed lawsuit over land ownership to the court.

"We will wait until the process is completed first. And then continued with land acquisition and compensation," he stated, Tuesday (1/26).

Head of Jakarta Water Management Dept, Teguh Hendrawan asserted his sub-dept will start the construction after the land status is clear and acquired.

"The reservoir will be used for water absorption before being flowed to the seat. If it was built, the flood in Kalideres and Cengkareng would be resolved," he finished.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye749 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye573 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye541 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye525 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye512 personAldi Geri Lumban Tobing