You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Waduk Kamal Masih Terkendala
.
photo Ilustrasi - Beritajakarta.id

Kamal Reservoir Construction Still Awaits Land Acquisition

We will wait until the process is completed first. And then continued with land acquisition and compensation

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

The construction of Kamal Reservoir, Kamal Urban Village, Kalideres, West Jakarta, still hampered by land acquisition. From total of 40 hectares needed, the land that has been acquired is only 5 hectares.

Tegal Alur Urban Village Head, Ahmad Mawardi said that most of the land has not been acquired is used by local residents for fish farming, shrimp and residence. Currently, they have filed lawsuit over land ownership to the court.

"We will wait until the process is completed first. And then continued with land acquisition and compensation," he stated, Tuesday (1/26).

Head of Jakarta Water Management Dept, Teguh Hendrawan asserted his sub-dept will start the construction after the land status is clear and acquired.

"The reservoir will be used for water absorption before being flowed to the seat. If it was built, the flood in Kalideres and Cengkareng would be resolved," he finished.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye716 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye603 personFolmer
  3. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye288 personBudhi Firmansyah Surapati
  4. Transjakarta Ready to Support People's Mobility This Eid

    access_time30-03-2025 remove_red_eye253 personAldi Geri Lumban Tobing
  5. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye249 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik