You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Waduk Kamal Masih Terkendala

Kamal Reservoir Construction Still Awaits Land Acquisition

We will wait until the process is completed first. And then continued with land acquisition and compensation

Land Acquisition Hampers Sheet Pile Installation in Pesanggrahan

The construction of Kamal Reservoir, Kamal Urban Village, Kalideres, West Jakarta, still hampered by land acquisition. From total of 40 hectares needed, the land that has been acquired is only 5 hectares.

Tegal Alur Urban Village Head, Ahmad Mawardi said that most of the land has not been acquired is used by local residents for fish farming, shrimp and residence. Currently, they have filed lawsuit over land ownership to the court.

"We will wait until the process is completed first. And then continued with land acquisition and compensation," he stated, Tuesday (1/26).

Head of Jakarta Water Management Dept, Teguh Hendrawan asserted his sub-dept will start the construction after the land status is clear and acquired.

"The reservoir will be used for water absorption before being flowed to the seat. If it was built, the flood in Kalideres and Cengkareng would be resolved," he finished.

Linked News
Popular News indeks
  1. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye798 personAldi Geri Lumban Tobing
  2. Jakarta Residents Welcome Rp1 Public Transport Fare

    access_time24-04-2026 remove_red_eye602 personNurito
  3. Limiting Gadget Use in Schools Expected to Boost Interaction and Reading Habits

    access_time24-04-2026 remove_red_eye583 personFakhrizal Fakhri
  4. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye564 personBudhi Firmansyah Surapati
  5. PT JIEP Targets Shenzhen Businesses with Investment Offers

    access_time24-04-2026 remove_red_eye558 personAldi Geri Lumban Tobing